A 5.0 MWh container and a 6.25 MWh container can need chillers almost 20 kW apart, or nearly the same chiller. The answer depends on the heat each cell produces over your duty cycle, the other loads on the same coolant loop, and the coolant temperature at which each chiller is rated. The two illustrative cases below run from cell count to required duty, then screen 40, 50, 60 and 80 kW units against the result. For the same method at cabinet scale, see our 215 kWh battery cabinet worked example.

Start from heat per cell, not from MWh
Stored energy does not set cooling duty. Part of a cell’s heat comes from internal resistance and rises with the square of current, so halving the current cuts that heat to about a quarter. The rest is reversible (entropic) heat, which changes size and sign with state of charge. Oak Ridge National Laboratory’s work on heat generation in lithium-ion batteries covers both. A kW-per-MWh ratio borrowed from another project brings that project’s cells, current and setpoint with it. Building the duty from cells keeps each assumption visible and replaceable.
Duration changes the current. For the same nominal DC energy at constant power and nominal voltage, a 4 h system runs at about 0.25C, a 2 h system at 0.5C and a 1 h system at 1C. Usable state of charge and AC ratings can shift these figures. With the same cell resistance and conditions, the steady resistive heat rate scales about 1:4:16 across the three cases. Reversible heat and ancillary loads do not scale that way, so do not double or quadruple a chiller rating by C-rate. In the 6.25 MWh Archetype B example below, about 10.0 W per cell fits a 40 kW unit at L45/W18. At 17 W per cell the loop duty is about 65.5 kW, so the comparison moves to the 80 kW unit at its warmer 20 °C rated point. Ask the cell supplier for heat per cell at your specified C-rate.
Two container archetypes
Both configurations come from published container datasheets, shown without manufacturer names. Each uses a 416-cell series string, 1,331.2 V nominal at 3.2 V per cell.
| Archetype | Configuration | Cells | Cell capacity | Nominal energy |
|---|---|---|---|---|
| A | 416S12P | 4,992 | 314 Ah | 5.016 MWh |
| B | 416S8P | 3,328 | 587 Ah | 6.251 MWh |
B stores about 25% more energy with a third fewer cells, so each cell carries more current: 293.5 A at 0.5C against 157 A for a 314 Ah cell. Whether that means more heat per cell depends on the cell’s resistance and construction. Take the figure from the cell supplier rather than scaling by cell size.
Required duty
The capacity the chiller must deliver at its rating condition is:
Qreq [kW] = (N × qcell [W] / 1000 + Qaux [kW]) × (1 + r)
N is the number of cells on the loop, qcell the average heat per cell over the design duty, and Qaux the heat from other equipment rejecting into the same loop. A separately cooled PCS is excluded. The reserve r covers uncertainty in the heat estimate, not ambient above the rating condition. The inputs here are illustrative: 8 W per cell and 2 kW ancillary for A, 17 W per cell and 3 kW for B, and a 10% reserve for both. The check is steady state and ignores thermal mass and short peaks at the ends of the state-of-charge window.

| Step | Archetype A | Archetype B |
|---|---|---|
| Cell heat | 4,992 × 8 W = 39.936 kW | 3,328 × 17 W = 56.576 kW |
| Plus same-loop ancillary | + 2.0 kW = 41.936 kW | + 3.0 kW = 59.576 kW |
| × 1.10 reserve | 46.13 kW | 65.53 kW |
How much cell heat each rating can absorb
Per-cell heat is the least certain input, so it helps to invert the formula: qmax [W] = 1000 × (P / (1 + r) − Qaux) / N, with the same ancillary loads and reserve.
| Rating and condition | Highest qcell, A (W) | Highest qcell, B (W) |
|---|---|---|
| 40 kW, L45/W18 | 6.88 | 10.03 |
| 50 kW, L45/W18 | 8.70 | 12.76 |
| 60 kW, L45/W18 | 10.53 | 15.49 |
| 80 kW, L45/W20 | 14.17 | 20.95 |
L45/W18 means 45 °C ambient and 18 °C coolant supply. The 80 kW unit is rated at a 20 °C supply, 2 K warmer than the others, and a colder supply lowers a chiller’s capacity. Its row holds only if the battery accepts 20 °C. If your design needs 18 °C, state that in the RFQ and ask for capacity at L45/W18 instead of comparing 80 kW at W20 with 60 kW at W18.
Choosing the unit
Archetype A, 50 or 60 kW. At 8 W per cell, the CTS0500L covers 46.13 kW with 3.87 kW to spare beyond the reserve. Choose it when the cell supplier’s data for your actual profile stays at or below about 8.7 W. Choose the CTS0600L when the heat figure is still preliminary or reaches 9 W per cell, which raises the duty to 51.62 kW. The 60 kW unit also gives more warm-up heat for cold sites, 24 kW against 16 kW.
Archetype B, 80 kW or two 40 kW. At 17 W per cell, 65.53 kW exceeds every 60 kW rating. One 80 kW vertical unit screens with 14.47 kW spare, provided a 20 °C supply is allowed. Two CTS0400L units give 80 kW at the colder W18 condition, which suits a battery that needs 18 °C. If one unit stops, 40 kW, about 61% of the duty, would remain if both pumps, the controls and the loop support operation with one unit running. That is not full redundancy, and it does not mean the battery can keep operating; confirm any reduced-power mode with the BESS integrator. The pair also needs coordinated pump and control logic. Before committing, confirm the 17 W figure: at about 15.5 W per cell or less, a single 60 kW unit covers B.
Flow and power
Required flow (L/min) ≈ Q [kW] × 60 / (3.55 × ΔT [K]), where 3.55 kJ/(L·K) approximates 50% ethylene glycol near 20 °C. A needs about 390 L/min at a 2 K rise; at the CTS0500L’s 500 L/min the rise is about 1.56 K. B needs about 554 L/min at 2 K; at the 80 kW unit’s 600 L/min it is about 1.85 K. Actual flow depends on the pump curve against your loop’s pressure drop, covered in our article on BESS chiller flow rate and pressure drop.
Electrical input is a separate figure from cooling capacity. The 80 kW unit’s published rated electrical input is up to 42 kW at rated conditions, with 47 kW maximum. These figures describe power draw, not feeder or protection design, which should follow the unit’s electrical data and local code. Part-load input is not published. Ask for it at your duty point, together with the electrical data your designer needs. At the rated point, 80 kW of cooling plus 42 kW of input indicates condenser heat rejection of about 122 kW. The actual figure depends on the system boundary, for example whether the pump is included in the rated input. Parameters are on the pages for the vertical CTS liquid cooling units and the 80 kW BESS liquid cooling chiller.
Get capacity at your duty point
We can confirm a unit against your actual duty rather than the illustrative inputs above. Send your cell count and heat per cell for your duty profile with its source, same-loop ancillary loads, the supply temperature your battery needs and where it is measured, allowed ΔT, design ambient, coolant, and any redundancy requirement. If your EU or US project specifies a refrigerant, check our guide to R32 and R410A rules for BESS liquid chillers and include the requirement in your request. Use the product page form or our contact page, and we will reply with capacity, input power and pump operating point at that duty.