Project Requirements & Challenges

The project presented several key challenges:

  • High thermal loads: Equipment cabinets with dense power electronics required strong cooling capacity.

  • Stringent protection standards: Systems needed to meet IP56-level dust and moisture resistance, ensuring reliable operation in semi-outdoor and industrial environments.

  • Operational stability: Continuous performance under varying seasonal conditions, from humid summers to cold winters, without downtime.

  • Delivery schedule: The project had a fixed installation window, requiring precise logistics and engineering support.

Our Solution

Cooltec supplied its 2500W industrial air conditioner, engineered for medium-to-large equipment cabinets with high cooling demand. The solution was designed with both performance and durability in mind.

Key highlights included:

  • High-capacity cooling: 4000W of cooling output, ensuring stable temperature control for heavily loaded equipment enclosures.

  • Energy-efficient design: Equipped with a high-efficiency rotary compressor and optimized heat exchanger to reduce energy consumption while maintaining reliability.

  • Protection and reliability: IP56 enclosure with reinforced sealing structure to safeguard against dust, moisture, and industrial contaminants.

  • Advanced testing: Each unit underwent thermal load and endurance testing to ensure performance across the UK’s diverse climate conditions.

  • Engineering customization: Configured for easy integration with the client’s cabinet systems, including flexible installation options and intelligent control features.

Deployment & Implementation

The air conditioners were delivered on schedule to the client’s UK facility. Our team provided comprehensive technical documentation and remote engineering support, ensuring smooth installation and commissioning. The deployment process was coordinated to minimize any disruption to ongoing production activities.

Outcome & Value

Since installation, the 4000W industrial air conditioners have maintained stable cabinet temperatures, effectively preventing overheating of mission-critical equipment. The solution has helped the client achieve:

  • Improved system reliability, reducing unplanned downtime.

  • Energy savings, thanks to optimized compressor and airflow design.

  • High operational confidence, with performance verified under full production loads.

The client expressed strong satisfaction with the equipment’s reliability and Cooltec’s responsive support. Building on this success, discussions are already in progress for additional projects, making Cooltec a trusted partner for industrial cooling solutions in the UK market.

Need help?

Don't hesitate to contact us

Table of Contents
Related articles
Get the easiest and most stable cooling air conditioner you are looking for
1924bfac-7e4a-44d6-8022-e53cef967ef1
Successful Installation of Cooltec 20kW Liquid Cooling System in New Delhi, India
We are delighted to share the successful completion of a 2MWh energy storage project in New Delhi, India,...
Read More
IMG_9430
How Cooltechx Helped Pakistan’s Trade Officials Build Brands with Data and Automation
Cooltechx trained 20 senior Pakistani trade officials, sharing data-driven workflows, RPA efficiency,...
Read More
5
2000W Industrial Air Conditioner Deployed in Pakistan Energy Storage Project
Client Background Our client is a renewable energy developer in Pakistan, focused on large-scale Battery...
Read More